What should happen and why? What will change?
What should happen?
What has already been done?
- Two documents have been created - Verification Study for the Development of Prague Market (IPR, 4ct, JONES LANG LASALLE) and an urban-architectural study (CMC architects).
- The documents outline the direction for the long-term development (the next 15 to 20 years).
- Even before the start of the construction work, Prague Market already hosted a pop-up cultural program for all generations, supplemented with a new gastronomy operation.
What should happen?
- Reconstruction of the listed former slaughterhouse building
- Preparations for the reconstruction of the utility networks