What should happen and why? What will change?

What should happen?

  • The transformation of the Smíchov railway station into a modern transport terminal.
  • The construction of a new terminal for intercity and urban bus transport above the railway station.
  • The construction of a P+R parking lot on Dobříšská Street with up to 1000 spaces.
  • The construction of B+R in several places, with a total capacity of up to 1000 bicycles.
  • Revitalization of the area in front of the railway station and changing the traffic layout.
  • Faster and easier transfer between different types of transport - train, bus, local public transport, Metro, P+R parking lot.
  • The electrification of bus transport at the terminal.
  • Supplementing the historic concourse from the 1950s with a new section, with shops and amenities for passengers.
  • The establishment of an office building for Správa železnic.
  • The new platform above the station will also include a pedestrian footbridge that links the area in front of the station to the new building to the north-west of the railway station.
About the project

Project base points

schedule

Commencement: 2021 
Process: 
2021 – Documentation for the issue of planning permission

  • 2022 - Documentation for building permission
  • 2023 - Documentation for the selection of a contractor and the selection of a building contractor

Completion: 2026

How much will it cost?

CZK 2.162 billion

Who will do the work?

Studie: A69 – architekti 
Následná dokumentace: SUDOP PRAHA + METROPROJEKT Praha. + A69 – architekti + SUDOP EU

The role of IPR prague

The contracting authority of an urban design/transport study, coordinator of the project until 2020 

Form

Urban design/ transport study

Contact details

Questions and inquiries: Ing. arch. Lukáš Tittl, 236004578, tittl-l@ipr.praha.eu, guarantor 

For the media: Mgr. Marek Vácha, vacha@ipr.praha.eu, 723 444 291, press spokesperson

Documents for download