Skip to main content
Quality public space was also created. Vinohradská became safer, more pleasant, and more elegant.

Vinohradská Avenue is undergoing gradual transformation. Reconstruction of the lower part was carried out in 2019 in line with our concept plan, which was created based on participation meetings with local residents. Vinohradská awaited an improvement of the traffic design, barrier-free tram stops, and better conditions for pedestrians. Quality public space was also created. Vinohradská became safer, more pleasant, and more elegant.

What should happen and why? What will change?

What should happen?

  • The improvement of the traffic design
  • The addition of missing crossings, the removal of railings
  • The connection of Jiřího z Poděbrad Square to Svatopluk Čech Park
  • The creation of barrier-free tram stops
  • Safer and more pleasant conditions for pedestrians
  • The addition of tree planting
  • The creation of new restaurant front gardens
  • The placement of new trash cans, benches, drinking fountains, and bicycle stands
  • A street more friendly to cyclists
  • The creation of a new protected route for recreational cyclists alongside Olšany Cemeteries
About the project

Project base points

schedule

Commencement: 2017
Completion: 2020

How much will it cost?

Approximately CZK 720 million

Who will do the work?

IPR

The role of IPR prague

Compiler of a conceptual study

Form

Conceptual study

Contact details

Questions and inquiries:  Ing. arch. Martin Špičák, 236004613, spicak@ipr.praha.eu, guarantor 

For the media: Mgr. Marek Vácha, vacha@ipr.praha.eu, 723 444 291, press spokesperson

Documents for download